Concealed Defects
Waterproofing details that become inaccessible after screeds, tiles or finishes are installed.
Specialist waterproofing execution and technical quality control for property developers and construction companies in Cyprus.
We work alongside construction teams to address critical waterproofing details during the building process — from substrate preparation to junctions, penetrations and concealed waterproofing systems.

A leaking roof. A wet wall behind a bathroom. Dampness at ground-floor level.
Water ingress discovered after a building has been handed over can result in disruptive investigations, opening finished surfaces, repeated repair works and disputes over responsibility.
Identifying the source can require access to concealed construction details and coordination between multiple contractors. For developers, this can consume engineering resources and complicate the management of defects during the warranty period.
Prevention begins with correct execution, clear responsibility and documentation before the work is concealed.

Unable to play here. Open the video directly.
Unable to play here. Open the video directly.
Waterproofing details that become inaccessible after screeds, tiles or finishes are installed.
Opening completed surfaces to investigate and repair moisture ingress.
Complex responsibility questions when multiple construction trades are involved.
SemeonidisLTD provides specialist waterproofing works as part of the construction process, coordinating execution with the project team and paying particular attention to areas where waterproofing continuity is essential.
Your site team has a whole development to deliver. We take on the agreed waterproofing scope and coordinate the details directly with your engineer.
Review the relevant construction details, waterproofing requirements, substrate conditions and interfaces with adjacent trades.
Agree scope, access and critical interfaces.Prepare surfaces and critical areas in accordance with the selected system requirements, including junctions, corners, penetrations and movement joints.
Check the substrate before application.Install the agreed waterproofing systems with attention to material compatibility, application conditions, continuity and manufacturer instructions.
Follow the selected system and sequence.Document key installation stages, particularly concealed details, and coordinate relevant checks with the project’s responsible engineer before subsequent works proceed.
Record the work before it is covered.


Technical checks relate to our agreed scope of work. Independent supervision or certification of other contractors’ work is not implied.
Project conditions determine the system.
Critical interfaces determine the detail.
01 / TECHNICAL SCOPEWaterproofing systems for exposed roofs, roof terraces, upstands, parapets and associated drainage details.
Upstands · outlets · continuity
02 / TECHNICAL SCOPEWaterproofing beneath external finishes, with attention to junctions, thresholds, drainage and movement joints.
Thresholds · drainage · movement
03 / TECHNICAL SCOPEMoisture protection and waterproofing works involving foundations, ground-contact structures and critical wall-to-slab interfaces.
Ground contact · wall-to-slab interfaces
04 / TECHNICAL SCOPEWaterproofing beneath finishes, including corners, wall-to-floor junctions, shower areas and service penetrations.
Corners · penetrations · continuity
05 / TECHNICAL SCOPETreatment of critical interfaces, pipe penetrations, joints and changes in construction geometry using appropriate system details.
Joints · interfaces · system detailing
06 / TECHNICAL SCOPEInvestigation-led repair works, crack injection and localised waterproofing interventions where existing structures exhibit moisture ingress.
Investigation · access · targeted treatmentSite photographs show selected conditions and details from our works. They illustrate the technical scope; one system is not suitable for every application.
Many important waterproofing details become difficult or impossible to inspect once subsequent construction layers have been installed.
Our approach emphasises coordination, visual documentation and attention to the critical stages of our own installation process.

A documented installation provides a clearer record of what was completed before the next construction stage began.
Agree inspection points, record accessible details and confirm readiness for the next construction stage with the responsible engineer.
Reliable waterproofing depends on more than selecting a product. Substrate preparation, compatibility, installation conditions, detailing and compliance with the selected manufacturer’s technical instructions all affect the completed system.
Our work may involve cementitious waterproofing, liquid-applied systems, sealing products and injection technologies, depending on the construction requirements.
Sika waterproofing and construction materials are among the products used in our work.

Review the exposed surface, access, existing layers and interfaces before agreeing the preparation scope.
Coordinate preparation, reinforcement or sealing details, application sequence and curing requirements.
Select the injection approach against the assessed condition and agreed objective. Record the accessible treatment locations and work stages.
See the conditions. Follow the work.
Discuss the scope with our team.
Watch the work where the problem is visible.
The site sequence shows active water ingress at a wall interface, preparation of injection points, injection work and local surface reinstatement.
Recorded sequence: active ingress, work at injection points and local treatment of the affected wall detail.
Review with your engineer: the affected area, known construction interfaces, available access and the intended treatment scope.
Discuss a similar projectUnable to play here. Open the video directly.
Unable to play here. Open the video directly.
Exposing construction layers and preparing access to perimeter details before subsequent works.
Opening-up, removal of local finishes and preparation around concealed interfaces.
Discuss this type of workUnable to play here. Open the video directly.
Preparation, drilling and injection equipment in use along internal wall and slab interfaces.
The site film records affected surfaces, preparation and injection operations.
Discuss this type of workUnable to play here. Open the video directly.
Exposed screed, perimeter upstands, door thresholds and local openings on an external terrace.
The site film shows substrate conditions and exposed junctions before reinstatement.
Discuss this type of workWaterproofing works carried out by our company within an agreed scope.
Technical communication during preparation, execution and before subsequent construction stages.
Photographic records of relevant installation stages and critical details.
Responsibility for the quality of our own completed works under the agreed contract terms.
If you have a residential or commercial development under construction, we would welcome the opportunity to review the waterproofing scope with your project engineer.
Share the project location, construction stage, relevant drawings or photographs, and the areas you want us to review.